单选题

The ()(吊货索套) at hatch No.1 is quite worn out.

Acargo light

Blashing wire

Ccargo sling

Dwire rope

正确答案

来源:www.examk.com

答案解析

相似试题
  • 双杆作业卸货,若吊货钩已挂好货物,则两吊货索的操作顺序应为:() ①、松大关吊货索; ②、绞大关吊货索; ③、绞小关吊货索同时松大关吊货索; ④、松小关吊货索和大关吊货索

    单选题查看答案

  • 双杆作业卸货,若吊货钩已挂好货物,则两吊货索的操作顺序应为()。 Ⅰ松大关吊货索; Ⅱ绞大关吊货索; Ⅲ绞小关吊货索同时松大关吊货索; Ⅳ松小关吊货索和大关吊货索。

    单选题查看答案

  • Put on ()(艇底塞) and hand the fender and the buoy.

    单选题查看答案

  • Put in boat plug and hand the fender and the puoy.()

    单选题查看答案

  • 吊货索()

    单选题查看答案

  • Rig the lifeboat ladder and safety net and report.()

    单选题查看答案

  • Make fast the fore and aft ropes and lay out the embarkation ladder.()

    单选题查看答案

  • The forecastle and the poop decks are a ship’s face and back.()

    单选题查看答案

  • The forecastle and the poop decks are a ship’s face and back.()

    单选题查看答案