The()process analyzes the effect of risk events and assigns a numerical rating to those risks.

ARiskldentification

BQuantitative RiskAnalysis

CQualitative RiskAnalysis

DRisk Monitoring and Control

正确答案

来源:www.examk.com

答案解析

该题的关键词为"analyzes the effect of risk, numerical rating",其语句结构为"The()一process(主语)analyzes(谓语)the effect of risk events(宾语)and assigns(并列谓语)anumerical rating to those risks(并列宾语)",含义为"什么过程分析风险事件的后果,并且为这些风险指定数值级别",容易判断题目描述的是量化风险分析的特点,应该选择选项B。
相似试题
  • Requirements management is the process of ()

    单选题查看答案

  • The TCP protocolis a ()layer protocol.

    单选题查看答案

  • Define Activities is the process ofidentifying the specific actions to be performed toproduce the()

    单选题查看答案

  • The()defines the phases that connect the beginning of a project to its end.

    单选题查看答案

  • The creation ofa work breakdown structure (WBS) is the process of()the major project deliverables.

    单选题查看答案

  • The()provides the project manager with the authority to apply organizational resources to project activities.

    单选题查看答案

  • In approximating costs, the estimator considers the possible causes ofvariation of the cost estimates, including()

    单选题查看答案

  • The most crucial time for project risk assessment is ( ).

    单选题查看答案

  • The ()process ascertains which risks have the potential of affecting the project and documenting the risks' characteristics.

    单选题查看答案

  • The()describes, in detail, the project's deliverables and the work required to create those deliverables.

    单选题查看答案